Skip to content
Skip to product information
1 of 4
In Stock — Ready to ship

Whatsminer Hydro Miner SA-30 Double Head Power Cable M63 M66 M53 M33 M34 to PDU

$9.80 USD
$9.80 USD $12.90 USD
Sale Sold out
Shipping calculated at checkout.
🇺🇸🇪🇺 USA & European Union: DDP shipping — all import duties & taxes included, no hidden fees.
🌍 Rest of world: Ships from China — local customs fees may apply on delivery.
Get Business Pricing
Secure checkout SSL encryption & invoicing options
Worldwide shipping Export-ready customs documentation
QC-tested spare parts Specialized in ASIC miner hardware
Technical support Assistance from mining engineers

Have questions about this product? Our team is here to help — just reach out on WhatsApp.

💬 Contact Us on WhatsApp

About the Product

Whatsminer SA-30 Double Head Power Cable – Hydro Miner to PDU Connection

Connect your Whatsminer hydro-cooled miner to a Power Distribution Unit (PDU) with this SA-30 double head power cable. The dual-plug design matches the power inlet layout on the M63, M66, M53, M33, and M34 series hydro/immersion miners, delivering both power rails through a single cable run. The robust construction handles the sustained high-current draw of 3,000 W+ mining hardware without connector overheating or voltage drop.

Why the Double Head Design Matters

Whatsminer hydro miners split their power intake across two connectors to distribute current and reduce thermal stress on any single contact point. A standard single-head cable cannot feed both inlets, meaning the miner will not power on or will run on a single rail with reduced hash rate. The SA-30 double head cable is the factory-specified solution: one cable, two plugs, full power delivery to both rails from a single PDU breaker slot.

Broad Hydro Series Compatibility

The cable fits the full range of MicroBT's liquid-cooled product line, including the M34S+, M33S, M33S+, M33S++, M53, M53S, M53S+, M53S++, M63, M63S, M66, and M66S. Whether you are running a small water-cooled cluster or a large immersion tank farm, this single cable SKU covers every model in the fleet.

Installation Tips

Route the cable to avoid sharp bends near the plug heads — repeated bending at the strain relief can fatigue the conductors over time. Ensure both plugs are fully seated and latched before energising the PDU breaker. After power-on, use a thermal camera or contact thermometer to verify the plug temperatures stay below 60 °C under full load during the first hour of operation. If either plug runs hot, reseat it and check for oxidation on the contact surfaces.

SA-30 Double Head Cable Specifications

Feature Specification
Connector Type SA-30 double head plug
Function Miner-to-PDU power connection
Compatibility M34S+, M33S, M33S+, M33S++, M53, M53S, M53S+, M53S++, M63, M63S, M66, M66S
Design Dual matching plugs
Build Durable, high-current rated
Condition New

Related Whatsminer Hydro Power Cables & Connectors

Cabling a hydro mining farm? Contact us at contact@lys-sz.com for cable bundles and volume pricing.

Worldwide shipping from our Shenzhen warehouse.

📦 Shipping & Customs

🇺🇸🇪🇺 USA & European Union (DDP):
Orders are delivered DDP. All customs duties, import taxes, and fees are included — no additional charges on delivery.

🌍 Rest of world:
Orders ship from China. Depending on your country, local customs authorities may apply import duties or taxes.

View Product Details
B2B · Wholesale

Buying in bulk for a mining farm or repair shop?

Get dedicated B2B pricing on this part and across our full catalog — quote response within 24 hours, payment by T/T USD bank wire, and DDP delivery available for US & EU customers (and other lanes on request).

Volume tiers DDP for US & EU T/T USD wire 24h response
You might like