Skip to content
Skip to product information
1 of 1
In Stock — Ready to ship

Antminer S19 PRO 100T Water Cooling Plate

$194.90 USD
$194.90 USD
Sale Sold out
Shipping calculated at checkout.
🇺🇸🇪🇺 USA & European Union: DDP shipping — all import duties & taxes included, no hidden fees.
🌍 Rest of world: Ships from China — local customs fees may apply on delivery.
Get Business Pricing
Secure checkout SSL encryption & invoicing options
Worldwide shipping Export-ready customs documentation
QC-tested spare parts Specialized in ASIC miner hardware
Technical support Assistance from mining engineers

Have questions about this product? Our team is here to help — just reach out on WhatsApp.

💬 Contact Us on WhatsApp

About the Product

Antminer S19 Pro 100T Water Cooling Plate Kit – Hashboard Hydro Upgrade

The Antminer S19 Pro 100T Water Cooling Plate Kit converts an air-cooled S19 Pro 100 TH/s miner to a forced-liquid cooling loop. A pump-driven circulation pulls heat directly off the hashboards through aluminum cold plates, holding the miner at its rated hashrate even at high ambient. The result: quick cooling, reduced overall power draw (no fan power, fewer thermal-throttling events), lower noise, and a cleaner thermal profile for home and small-farm setups.

S19 Pro 100T Water Cooling Plate Kit – Parts List

Kit Component Quantity
Water cooling plate 6 pcs
ASIC miner water cooling liquid shunt multi 2 pcs
Silicone water pipe 2 m
Main water pipe 2 m
Clamps Included
Compatibility Antminer S19 Pro 100T miners
Cooling Method Forced liquid circulation (pump-driven)
Condition Brand New

Why Water-Cool an S19 Pro 100T

Air-cooled S19 Pros run loud and become temperature-sensitive above ~30 °C inlet. Once ambient climbs, the chassis fans spin up to noise levels that are untenable indoors and the firmware starts to throttle hashrate. A water cooling plate moves heat out of the chassis into a small external loop, returning the miner to rated ~100 TH/s, cutting acoustic output significantly, reducing dust ingress and extending hashboard lifetime in continuous duty.

Installation Notes

Power the S19 Pro fully off and disconnect mains before opening the chassis. Remove the original heatsinks, fit each of the 6 hashboard positions with a water cooling plate, route the silicone pipes through the two shunt manifolds and into the main pipe, secure with clamps, and pressure-test the loop before re-energising. Pair with a 4-pin fan-speed simulator so the controller doesn't trip a fan-fault once the air fans are removed.

Related Antminer Water Cooling Plate Kits

Run your Antminer S19 Pro 100T quietly and stably on water. Order online or contact us at contact@lys-sz.com for farm-quantity pricing. Worldwide shipping from our Shenzhen warehouse.

📦 Shipping & Customs

🇺🇸🇪🇺 USA & European Union (DDP):
Orders are delivered DDP. All customs duties, import taxes, and fees are included — no additional charges on delivery.

🌍 Rest of world:
Orders ship from China. Depending on your country, local customs authorities may apply import duties or taxes.

View Product Details
B2B · Wholesale

Buying in bulk for a mining farm or repair shop?

Get dedicated B2B pricing on this part and across our full catalog — quote response within 24 hours, payment by T/T USD bank wire, and DDP delivery available for US & EU customers (and other lanes on request).

Volume tiers DDP for US & EU T/T USD wire 24h response
You might like